ByteGrid™  announces new data center in Silver Spring, Maryland opening Spring 2012.

Byte Grid Silver Spring

ByteGrid™ announces new data center in Silver Spring, Maryland opening Spring 2012.

QTS - Richmond (VA)

The PUE of a data center is the key figure that shows how green a data center actually is. AISO’s PUE is 1.14 where as most data centers in the US according to the EPA have PUE’s of 2.0 to 3.0.

AISO - Romoland, CA

The PUE of a data center is the key figure that shows how green a data center actually is. AISO’s PUE is 1.14 where as most data centers in the US according to the EPA have PUE’s of 2.0 to 3.0.

Power

On-site Georgia Power substation in a high reliability configuration delivers 120 MVA to facility
Power fed by two diverse substations and two electrical grids
Thirty-six (36) generators support 16 independent UPS systems
Cooling

N+1 configuation for chiller, pumps and cooling towers
Over 280-30-ton Lieberts provide air flow to raised floor space
Temperature under floor delivered at 68º ± 5º with humidity at 50% ± 5%

QTS - Atlanta, GA

Power On-site Georgia Power substation in a high reliability configuration delivers 120 MVA to facility Power fed by two diverse substations and two electrical grids Thirty-six (36) generators support 16 independent UPS systems Cooling N+1 configuation for chiller, pumps and cooling towers Over 280-30-ton Lieberts provide air flow to raised floor space Temperature under floor delivered at 68º ± 5º with humidity at 50% ± 5%

  • IO Data Center - Edison (NJ)

    IO Data Center - Edison (NJ)

    At 800,000 square feet, the i/o New Jersey building is one of the largest data center facilities in the world. It’s big enough that the company uses a Zamboni to clean ..